Summary of data management meeting Tuesday, February 17th, 2004 9:30 Bat 2-1034 ============================================================================== Present: N.Brook, C.Cioffi, J.Closier, M.Frank, V.Garonne, R.Graciani, G.Kutznetsov, J.Saborido, A.Soroko, I.Stokes-Rees, A.Tsaragorotzev, R.Vizcaya Rount table report: ------------------- Workload Management System (Andrei): - Tests are ongoing at CERN, Oxford and Marseille - Tuning of jobs running applications is necessary Monitoring (Ricardo): No change Accounting (Ricardo): Graphical UI under development Shopping list for DC04: ----------------------- The items below are just a short list of what must be done. Please take them as a reminder. - Incorporate the AliEn file catalog into the production system. - Keep XML based catalogs for journaling and populate the AliEn catalog throm those. ---> Action Andrei - Analysis tasks will consume data - They will either need consistent slices of the catalog in XML form to perform analysis on non-LCG2 sites. If the analysis tasks are running on a LCG2 site, then the standard LCG2 tools (including POOL interface to the LCG file catalog) should be used. - XML catalog slices will have to be generated at the level of the bookkeeping user interface - Data Management Tools - Registration of files produced outside LCG into the LCG file catalog - Synchronization between LCG RLS and AliEn ---> Action Joel - WMS - Tests, tests, tests ---> Action Vincent, Ian - Job execution logic ---> Action Andrei - Monitoring & Accounting: - Python interface (including RPC) - Query interface ---> Action Manuel - Graphical UI ---> Action Ruben - Job creation from the production database ---> Action Markus - Dirac desktop It was decided, that the Dirac desktop of Gennady will no longer be the mainstream activity since it is unclear if the development of these new components can be achieved in time. Tests however should be possible. System test: ------------ A preliminary system test is forseen for the beginning of March. The integration of all components should be finished then. The DIRAC agent software is supposed to be distributed by the end of this week. Cheers, Markus Frank