This is the title of the note
LHCB Technical Note
Issue: Draft
Revision: 1
Reference: LHCB XXX 97-nn
Created: 11th Dec 1997
Last modified: 11th Dec 1997
Prepared By: LHCB XXX Group
A. Collaborator/Editor
Abstract
This abstract should be around 150 words.
Document Status Sheet
1. Document Title: [Project Name Qualification] User Requirements Document |
|||
2. Document Reference Number: [Document Reference Number] |
|||
3. Issue |
4. Revision |
5. Date |
6. Reason for change |
Draft |
1 |
11 Dec 97 |
First version |
Table of Contents
List of Figures
This document discusses the planning for the LHCB Computing Project.
The mandate of the LHCB Computing team is to take responsibility for the computing infrastructure, which includes both hardware and software aspects, for all computing intensive activities of the experiment. This includes computing for the on-line and off-line systems, support for office automation and documentation, tools for enhancing effective world-wide collaboration etc.. The project organisation must take into account the interface with the people that take responsibility for sub-detector dependent software and hardware developments.
The total manpower specifically required for Steering Group is 2 FTE. The leader of each subgroup is also a member of the Steering Group.
Table 2 Manpower for Steering Group
[1] Software Strategy for the LHCB experiment, LHCB 97-??
[2] Technology Tracking Project Documentation : see URL http://wwwinfo.cern.ch/di/ttt.html