[ Home | Contents | Search | Post | Reply | Next | Previous | Up ]
From: Beat.Jost@cern.ch
Date: 5/1/00
Time: 8:51:39 PM
Remote Name: 137.138.245.148
Agenda of LHCb Online meeting of May 3 2000 Date: 3 May 2000 Time: 14:00 Place: TBS Agenda: 1. News 2. Agenda of FE/Controls/DAQ workshop (see attached draft agenda) Discussion on what we can present in our slots and what should be added/removed 3. AOB Please let one of us know if you want to add any item to the agenda. Clar & Beat Draft of Agenda for FE/Controls/DAQ workshop to be held 16-19 May 2000. ---------------------------------------------------------- ===================== FRONT-END ====================== ---------------------------------------------------------- Organizer: Jorgen Christiansen Tuesday afternoon: Radiation environment Georg van Holtey or Vadim Talanov Radiation level estimates Jorgen Christiansen: Qualification of electronics for radiation effects Daniel Lacarrere Location of electronics ALL: Specific problems with radiation Changes to placement of electronics Access to electronics in cavern and detectors Hans Jurgen Hilke: Access procedure, Access periods, reliability requirements All: Identification of vital components ( trigger systems, etc.) Reliability/redundancy of such components Front-end error conditions Jorgen Christiansen : Error sources: SEU, glitches, buffer overflows, etc. Error propagation Error recovery Error rate estimation All: Special error problems in specific sub-detectors Special error recovery problems in specific sub-detectors Wednesday: Resets: Hans Dijkstra: Physics loss related to resets Jorgen Christiansen: Definition of reset types Definition of reset scenarios (agreement required NOW) Synchronization: Jorgen Christiansen: "Standard bunch collision synchronization" Dominique Breton: Board to board synchronization (L0 trigger system) All: Special subdetector problems and solutions (muon, outer tracker) L1 buffer Hans Dijkstra or Volker Lindenstruth Buffer size requirements for L1 trigger Expandability ( is this a must, up to which size) All: Specific problems with given L1 buffer size (costs board space, etc.) Interface to trigger systems: Jorgen Christiansen Data to read out from trigger systems Requirements to front-end to monitor trigger systems Hans Dijkstra: Problems with zero-suppression when monitoring trigger systems All: Special sub-detector/trigger problems Interface to FEM: Hans Muller / Francios Bal Front-end multiplexing. link technology link protocol All: Special requirements ( bandwidth, mux ratio, distance, location) Power supplies Jorgen Christiansen Standardization possible ? Radiation levels Location Wilfried Flegel: Magnetic stray fields in cavern All: Special requirements to power supplies (low noise, etc.) Grounding: Raymond Frei: Ground loop prevention (isolated of detectors, Isolation from mechanical structures, optical/copper links) Signal shielding (LVDS) Special grounding problems in Vertex detector All: Specific subdetector problems ---------------------------------------------------------- ===================== DAQ ====================== ---------------------------------------------------------- Organizer: Beat Jost Thursday (morning) TFC (timing and fast control) Status Partitioning and related distribution switch Beat Jost 20' Requirements to readout supervisor Richard Jacobsson 20' Discussion All 20' Throttling Throttling Infrastructure Keeping track of dead time Keeping track of who throttles Beat Jost 30' Discussion All 30' Readout unit: (exact topics to be confirmed) Data checking Error recovery Non zero-suppressed data ? Hans Muller 30' Total 2h30' ---------------------------------------------------------- ===================== CONTROLS ====================== ---------------------------------------------------------- Organizer: Clara Gaspar Thusday (afternoon): Chip level controls Control system for CMS tracker Sandro Marchioro 30' Long distance I2C/JTAG (???) Discussion All 20' Summary of Control requirements from sub-detectors ( Bandwidth , number of boards, etc.) Clara Gaspar 10' Discussion All 30' Vertex detector control: Interface to LHC machine Safety, UPS, etc. Massi Ferro-Luzzi 20' Board level controls Credit card PC's/ Local Board Control bus Beat Jost 30' Firewire???? Geneva Engineering School 10' Discussion All 20' General ECS Infrastructure Clara Gaspar 30' Total: 3h20' Friday (morning) Summaries Front-End Joergen 15' DAQ Beat 15' Controls Clara 15' General Discussion on open issues/proposed technologies, etc. All 0'-90' Total: <2h30'