Home Computing DAQ E-mail Notes Meetings Subsystems Search

 

The control systems of the four LHC experiments are being developed in common within the Joint COntrols Project (JCOP).


LHCb's Experiment Control System is in charge of the configuration, control and monitoring of all the components of the online system. This includes all devices in the areas of: data acquisition, detector control (ex slow controls), trigger, timing and the interaction with the outside world.

Framework

The central ECS team will provide a framework to the sub-detectors groups which will need to configure and develop the specific control functions for their sub-detector. 

The control framework is based on a SCADA (Supervisory Control and Data Acquisition) system called PVSSII and it will have to be interfaced to all experimental equipment.

Recommended Components and Interfaces

Program of work & activities

People

Presentations at LHCb meetings:

Other presentations:

Controls Related Information:

Information on controls for other experiments at LHC

Documentation and Presentations before 2000

This page last edited by CG on November 22, 2005.